rib-software.com

Website review rib-software.com

RIB Software ▷ Innovative Construction Software Solutions

 Generated on March 05 2026 04:42 AM

Old data? UPDATE !

The score is 57/100

SEO Content

Title

RIB Software ▷ Innovative Construction Software Solutions

Length : 57

Perfect, your title contains between 10 and 70 characters.

Description

Master every stage of a building’s lifecycle with modern construction software solutions: ✓ Save resources ✓ Reduce costs ✓ Support sustainability

Length : 146

Great, your meta description contains between 70 and 160 characters.

Keywords

Very bad. We haven't found meta keywords on your page. Use this free online meta tags generator to create keywords.

Og Meta Properties

Good, your page take advantage of Og Properties.

Property Content
locale en_US
locale:alternate da_DK
type website
title RIB Software ▷ Innovative Construction Software Solutions
description Master every stage of a building’s lifecycle with modern construction software solutions: ✓ Save resources ✓ Reduce costs ✓ Support sustainability
url https://www.rib-software.com/en/
site_name RIB Software
updated_time 2026-02-20T11:41:11+02:00
image https://www.rib-software.com/app/uploads/2024/01/Home_Header_Image-1024x414.webp
image:secure_url https://www.rib-software.com/app/uploads/2024/01/Home_Header_Image-1024x414.webp
image:width 1024
image:height 414
image:alt Home
image:type image/webp
video https://www.youtube.com/embed/g0oqpcBomoM

Headings

H1 H2 H3 H4 H5 H6
1 13 0 0 2 0
  • [H1] RIB Construction Software Enables Companies To
  • [H2] Building Efficiency Through Connection
  • [H2] RIB Software is trusted by 23,000+ companies in over 100 countries
  • [H2] Project Focus
  • [H2] Job Role
  • [H2] At the Top of the Industry: Recognized as a Leader by Verdantix!
  • [H2] What Our Clients Say
  • [H2] Powered by RIB
  • [H2] Case Studies
  • [H2] Industry:\n\n\n\nCivil construction.\n\n\n\nClient:\n\n\n\nWestforce Construction is a based in Western Australia and was founded in 2006,as an earthworks and concrete specialist. Since then, the company has grown exponentially to become a major contractor that specialises in all aspects of civil and structural construction works. Their key areas of focus are the resource and infrastructure sectors, and the company has completed numerous projects for the government departments of Defence, Water Corporation, Western Power, Main Roads, and Public Transport Association (PTA).\n\n\n\nIn December 2017, Westforce became part of the Raubex Group, one of South Africa\u2019s leading infrastructure and construction material supply groups. Their expertise extends across a variety of sectors including materials, roads, earthworks and infrastructure.\n\n\n\nTo date, the biggest and most successful project completed by Westforce has been a joint venture with JWI Construction, which saw both companies upgrade the drain diversion system for the Vasse River.\n\n\n\n\n\nThe Challenge:\n\n\n\nAs labour in Australia is expensive, Stanley Bubb, the financial manager at Westforce has access to a smaller workforce with which to run an effective financial department. In practise, this means that he and his assistant are responsible for managing the entire department from start to finish. This includes reconciling and paying invoices, completing all cost reporting and consolidating final reports for the Raubex head office.\n\n\n\n\n\n\nThe most important feature for me is the seamless integration between procurement and accounting provided by RIB with BuildSmart.\nStanley Bubb, Finance ManagerWestforce Construction\n\n\n\n\n\nBefore the implementation of the RIB solution, Westforce experienced a variety of challenges including:\n\n\n\n\nManual and time-consuming procurement of orders and processing of invoices\nIneffective reconciliation\nFaulty tracking of commitments and costs\nInaccurate cost reporting to head office\nDefective payroll calculations\n\n\n\n\nThe Solution:\n\n\n\nIn June 2019, RIB successfully implemented BuildSmart for Westforce. Having worked with this cost management and construction accounting solution previously, Stanley Bubb was already well acquainted with the software which led to a seamless integration with the company\u2019s day-to-day processes and workflow.\n\n\n\nBy integrating construction and project management as well as cost and accounting administration, BuildSmart empowers Westforce to operate as a successful construction company with integrated systems that ensure the correct execution and completion of projects.\n\n\n\nToday, Westforce benefits greatly from their use of BuildSmart, with the software providing an approval matrix designed to ensure that the procurement of electronic purchase orders is always pre-approved, and the reconciliation of orders is cost efficient.\n\n\n\nCost reporting to the Raubex head office has also become effortless thanks to BuildSmart\u2019s ability to export transaction listings.\n\n\n\nThe Results:\n\n\n\nSince implementing BuildSmart, Westforce has successfully completed a number of various projects such as:\n\n\n\n\nExcavation and earthworks for the Roy Hill Iron Ore mine in Newman\nThe construction of a new access walkway for train maintenance by the Public Transport Authority in Ridgewood\nAnd the Vasse River diversion drain upgrade in Busselton mentioned previously.\n\n\n\n\nGoing forward, Westforce plans to implement Candy and integrate it with BuildSmart to harness the full potential of the RIB Complete Solution; providing the company with enhanced functionality and visibility of their processes and budgets in real-time.\n","post_title":"Westforce Construction","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"westforce-construction","to_ping":"","pinged":"","post_modified":"2024-08-28 08:43:09","post_modified_gmt":"2024-08-28 06:43:09","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/westforce-construction\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1745,"post_author":"9","post_date":"2022-10-20 13:26:00","post_date_gmt":"2022-10-20 13:26:00","post_content":"\nIndustries:\n\n\n\nCivil Engineering\n\n\n\nGroundwork\n\n\n\nBackground:\n\n\n\nEstablished in 1994, PP Construction is a British-based contractor that operates across a variety of sectors including commercial, defence, education, infrastructure and retail.\n\n\n\nWith a hands-on approach to project management, the company believes in partnering closely with clients from the planning stage through to final delivery; this ensures every job is completed safely, on time and budget.\n\n\n\nAs a result of this ethos, PP Construction not only enjoys sustained success but repeat business from clients such as Balfour Beatty, Croudace Homes and Wates Construction. Today, the company has an annual turnover of \u00a310 million and works on projects ranging in value from \u00a350,000 to \u00a310 million.\n\n\n\n\n\nThe Challenge:\n\n\n\nTo ensure the successful day-to-day operation of the organisation, PP Construction has to be able to allocate costs correctly to their project and then track the progress of each throughout the lifecycle of a project.\n\n\n\nUnfortunately, before 2021, the company utilised a spreadsheet-based system that resulted in siloed information, manual errors and no means to identify\u2014in real time\u2014if a job was losing or making money. On top of this, the business also employed a generic enterprise resource planning solution that was not tailored to the construction industry.\n\n\n\n\n\n\nSupport has been absolutely incredible \u2013 even after-hours. Anytime and every time we have asked or needed support; RIB have been there for us. A quote from the last directors board meeting- \u2018These are the most solid figures and best reports we\u2019ve had in 26 years! We didn\u2019t use to know something was wrong until we ran out of money but now, we know before it gets to that and where we are losing it, allowing us to intervene and take corrective action before it\u2019s too late\u2019.\nZoe Perriam, Financial ControllerPP Construction Ltd\n\n\n\nThe Solution:\n\n\n\nAs a fully integrated cost management and enterprise accounting system, RIB BuildSmart was put forward to address the challenges encountered by PP Construction. Together with features designed specifically for the construction industry, this software seamlessly consolidates data for real-time insights no matter the stage of a project.\n\n\n\nThe Result:\n\n\n\nWith the implementation of BuildSmart, PP Construction is now empowered by a fit-for-purpose solution that harnesses data in real time to unite all stakeholders while covering every phase in the life cycle of a project.\n\n\n\nAs a result, the company not only enjoys the benefits of a construction-specific solution that aligns with their daily workflow, both in the office and on site, but they are also able to access valuable information from which informed decisions can be made on an operational, commercial and financial basis.\n\n\n\nThis, in turn, has led to significant cost savings thanks to the solution\u2019s in-depth and detailed reporting, increased collaboration between colleagues who all work from a single source of truth now, and phenomenal peace of mind stemming from superior 24\/7 support.\n\n\n\nGoing forward, PP Construction plan to implement RIB Candy and combine its estimating and project control functionality with BuildSmart, thereby unlocking for even greater cost control.\n","post_title":"PP Construction Ltd","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"pp-construction-ltd","to_ping":"","pinged":"","post_modified":"2024-08-28 08:47:53","post_modified_gmt":"2024-08-28 06:47:53","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/pp-construction-ltd\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1740,"post_author":"9","post_date":"2022-11-15 13:26:00","post_date_gmt":"2022-11-15 13:26:00","post_content":"\n\/*! elementor - v3.14.0 - 08-06-2023 *\/\n.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}\n\n\n\nIndustry:\n\n\n\n\nEarthworks\nCivil Construction\nCommercial and Industrial\nRail Works\nPublic Works\n\n\n\n\nClient:\n\n\n\nDavison Earthmovers is based in Adelaide, South Australia, and has been in operation since 1986. The company was originally founded by John Davison but in July 2021 was taken over by his son, Paul. The company is focused on providing earthmoving services to the commercial, industrial, government and civil sectors. They undertake a wide variety of projects, ranging from large-scale bulk earthworks using heavy machinery to smaller detailed works such as drainage, kerbing, landscaping, bitumen surfacing and more.\n\n\n\nOne of their biggest projects completed to date is the Mount Barker Regional Sports Hub which includes two full-sized soccer pitches, 28 000 m2 of roadway and footpath pavement, building pad construction works, two kilometres of stormwater infrastructure, and 700 m of grated-drain installation. The contract value for this project was $3.7 million and the construction duration was ten months.\n\n\n\n\n\nThe Challenge:\n\n\n\nBefore BuildSmart was implemented, Administration Manager Mary-Ann Higgins and her team experienced numerous challenges including:\n\n\n\n\nThe execution of supplier invoice approvals and storage processes separately from their accounting system\nThe manual consolidation of contracts, plant ledger and payroll to the general ledger\nCumbersome, manual data capturing utilising a paper-based system\nA reporting process hampered by a lack of effective system report options and ineffective collation of data\nNo activity-based costing which made it difficult to establish whether a project was making a profit or a loss\n\n\n\n\n\n\n\nI\u2019d recommend BuildSmart as a fully integrated system that includes payroll, plant and procurement modules. It gives us greater visibility and control, as all our information and documents are in one place. The combination of value for money, for all these modules in one system, together with dedicated support is great.\nMary-Ann Higgins, Administration Manager, Davison Earthmovers\n\n\n\nThe Solution:\n\n\n\nThe implementation of BuildSmart began in February 2021 and the solution went live in May of the same year. The entire process ran smoothly and was well received by Davison Earthmovers thanks to 24\/7 support from the RIB BuildSmart team.\n\n\n\nSince implementing the software:\n\n\n\n\nFull procurement workflow now happens automatically\nUnapproved committed costs and progress claims can be tracked and resolved accordingly\nImporting plant hours is seamlesstakes around an hour to complete as opposed to eight hours previously\nPayroll integration has improved with pay period rollover automatically posting to the contracts and general ledger\nLedger transactions can be run according to categories such as contact, supplier or by contract activity code. Reporting options and parameters have also improved vastly.\n\n\n\n\nThe Results:\n\n\n\nDavison Earthmovers\u2019 workflow and overview of their projects have been enhanced significantly with the help of BuildSmart. Thanks to the boost in productivity resulting from the solution, the company also enjoys improved cost and contract management, allowing time for the improvement of other systems and procedures.\n","post_title":"Davison Earthmovers","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"davison-earthmovers","to_ping":"","pinged":"","post_modified":"2024-08-28 09:34:18","post_modified_gmt":"2024-08-28 07:34:18","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/davison-earthmovers\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1741,"post_author":"9","post_date":"2022-04-29 13:26:00","post_date_gmt":"2022-04-29 13:26:00","post_content":"\nIndustry:\n\n\n\nSummertown Interiors is focused on Commercial, Healthcare and Retail related Fit-out projects.\n\n\n\nClient:\n\n\n\nSummertown Interiors\n\n\n\nFor over 20 Years, Summertown Interiors has been among the UAE\u2019s leading and most sustainable contractors, offering superior quality interior fit out solutions. Reputed for its green expertise and exceptional client service, the company specialises in commercial, healthcare, and education projects for global Fortune 500 companies, government authorities and local businesses.\n\n\n\nSummertown Interiors was the first fit-out contractor to occupy LEED Gold certified interiors in the United Arab Emirates and has also been awarded the LEED gold certification for its existing building; operations and maintenance (LEED EBOM). All projects are executed in accordance with the internationally recognised ISO 9001:2015 quality management system.\n\n\n\nSummertown Interior\u2019s mission is to consistently deliver high end interior projects on time and within budget, whilst helping companies to achieve their environmental goals, directly resulting in operational savings and a better workspace for employees.\n\n\n\n\n\nThe Challenge:\n\n\n\nPrior to implementing RIB solutions Candy and BuildSmart, Summertown Interiors faced challenges regarding procurement, timeous cost report generation, departments working in silos, timeous closing of books of account, delayed annual audits and visibility of cost to complete on a contract. They were also seeking software that would boost their tendering system in a highly competitive business, like interior fitout.\n\n\n\n\n\n\nI would recommend RIB products to others because it is developed by Contractors for Contractors\nDeniz Demir, Finance ManagerSummertown Interiors\n\n\n\nThe Solution:\n\n\n\nSummertown Interiors chose BuildSmart to form the backbone of their financial management system and Candy as their primary estimation and project control solution.\n\n\n\nImplementation:\n\n\n\nSummertown Interiors implemented RIB to meet the challenges faced by all departments and to streamline workflows and processes from first estimate through to final account. This included:\n\n\n\n\nCandy Estimating and Project Control\nBuildSmart Accounts\nBuildSmart Site Costs\nBuildSmart Procurement\nBuildSmart Payroll and Wages\nBuildSmart Equipment and Asset Management\n\n\n\n\nThe Results:\n\n\n\nSummertown Interiors have not only been empowered with tools for real-time \u2018cost vs allowable\u2019 comparisons, profitability analysis, and faster and more efficient decision-making; they have also successfully executed several large-scale projects for clients such as Takeda and the Government of Dubai Media Office.\n\n\n\nIn addition, the integrated cost management solution, comprising of Candy and BuildSmart, has led to significant time-savings, with month-end closings and audits now completed much faster than before, as well as increased accuracy when estimating. Deniz explains, \u201cthe safeguards that BuildSmart Procurement has in place, to prevent allowable rates and quantities being exceeded during purchasing, have also reduced failure costs.\u201d\n","post_title":"Summertown Interiors","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"summertown-interiors","to_ping":"","pinged":"","post_modified":"2024-08-28 09:41:24","post_modified_gmt":"2024-08-28 07:41:24","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/summertown-interiors\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1729,"post_author":"9","post_date":"2022-04-29 13:26:00","post_date_gmt":"2022-04-29 13:26:00","post_content":"\n\/*! elementor - v3.14.0 - 08-06-2023 *\/\n.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}\n\n\n\nIndustry:\n\n\n\nConstruction.\n\n\n\nClient:\n\n\n\nBK Gulf LLC.\n\n\n\nEstablished in 1978, BK Gulf LLC, part of the DUTCO Group of companies, are an MEP building services company providing a complete contracting service including design, procurement, installation, project management, commissioning and facilities management services to meet specific client requirements.\n\n\n\nBK Gulf LLC has been involved with some of the largest and most prestigious projects in the Middle East and covers a wide range of market sectors from residential and commercial property and hotel resorts to infrastructure development and airport expansion projects.\n\n\n\n\n\nThe Challenge:\n\n\n\nAs a provider of end-to- end construction services, the teams at BK Gulf manage projects that require highly complex cost control and productivity management. Often the teams were only able to analyse the data in hindsight, by which time, corrections and alternations were too late to be fully effective. This needed to change. As a result, BK Gulf wanted to overhaul their fairly closed accounts system. The need for easily accessible, visible, real time data was identified as the core solution along with reporting and procurement functions.\n\n\n\n\n\n\nRIB delivered more than we expected in a very short time frame. As part of the implementation process, the team ensured thorough knowledge transfer. This has enabled BK Gulf to realise the full benefits of the products immediately. We certainly made the right decision for our business by choosing RIB as our business partner. \nLuke Ashe, Commercial ManagerBKGULF LLC\n\n\n\n\n\nThe Solution:\n\n\n\nSharing Knowledge for better Solutions\n\n\n\nBK Gulf wanted a solution, not just a product. They knew that one-stop integrated systems are what we\u2019re best at. It was important for them to work with people who didn\u2019t just understand software, but who understood the industry. BK Gulf valued our field-specific knowledge, especially because our consultants had already come across similar problems. A fresh yet experienced pair of eyes was what they needed \u2013 and that is exactly what they got.\n\n\n\nImplementation\n\n\n\nOur preferred solution was quick and effective. We recommended a three (3) month programme implementing both Candy and BuildSmart simultaneously, focusing on:\n\n\n\n\nCandy Estimating & Project Control\nBuildSmart Accounts and Site costing\nBuildSmart Procurement and Materials costing\nBuildSmart Stock and Inventory Management\nBuildSmart Plant Management, Maintenance and Costing, Yard Stock\nBuildSmart Sub-Contractor Management\n\n\n\n\nThe Results:\n\n\n\nTime is of the Essence\n\n\n\nOur software is driving business efficiency at BK Gulf. Candy Valuations breaks down the BOQ, giving a quick snapshot and speeding up procurement. Information entered as work is done automatically feeds into the system \u2013 ready for reporting at the click of a button. They used to spend around ten (10) days manually pulling together cost reports from accounts release. That\u2019s now down to two (2) days. This has huge practical advantages. Staff have more time to review the data instead of preparing it. Audit time is reduced. And the board gets reports sooner thanks to the faster release of accounts information. The whole process used to take six (6) weeks. Now it takes just two (2) to three (3).\n\n\n\nReal-time Cost Approvals with Accuracy\n\n\n\nBK Gulf are now in control of contract costs. An updated resource list of the contract and BuildSmart ICMS real-time reporting means they can sit and discuss issues for the next plan \u2013 not old issues that have already happened. Data is hugely more accurate too. Information comes from source giving better quality data they know they can trust. They no longer need to pull together separate pieces of information together, meaning they no longer risk making errors. BK Gulf now have a tool to analyse data and find out if\/where there are any discrepancies.\n\n\n\nIntelligent Integration with Integrity\n\n\n\nRIB solutions are different to other software because they link and integrate all data. Everyone at BK Gulf now works with standard reports. In the same language. In the same format. Plus tight system security keeps their data safe.Clean cost data has been the biggest improvement for BK Gulf and it\u2019s thanks to our seamless link between procurement and cost accounting. They have the cost and activity codes right at the start, meaning everything flows all the way through. Gone are the days of manual requisitions and changing cost codes as the project goes through various approvals.\n","post_title":"BK Gulf LLC","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"bk-gulf-llc","to_ping":"","pinged":"","post_modified":"2024-08-27 16:30:28","post_modified_gmt":"2024-08-27 14:30:28","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/bk-gulf-llc\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1720,"post_author":"9","post_date":"2022-05-05 13:26:00","post_date_gmt":"2022-05-05 13:26:00","post_content":"\nBurj Al Arab is a luxury hotel located in Dubai, UAE. At 321m, it is the third tallest hotel in the world. Burj Al Arab stands on an artificial island 280m from Jumeirah beach and is connected to the mainland by a private curving bridge. The shape of the structure is designed to mimic the sail of a ship. It has a helipad near the roof at a height of 210m above ground.\n\n\n\n\n\nClient: Murray & Roberts and Al Habtoor Engineering\n\n\n\nOwner: Jumeirah group\n\n\n\nLocation: Dubai, UAE\n\n\n\nScope of work: Main Contractors\n\n\n\nSector: Hospitality\n\n\n\nContract Period: 1994 \u2013 1999\n\n\n\nNumber of rooms: 202\n\n\n\nFloor count: 56 (3 below ground)\n\n\n\nHight:\n\n\n\n\nArchitectural: 321m\nTop floor: 197.5m\n\n\n\n\nContract Value: US$ 1 000 000 000\n\n\n\nProduct used: RIB Candy Software\n\n\n\n\n\n\n\n\n\n\n\nInteresting Facts:\n\n\n\n\nConstruction involved 3000 companies and contractors; 250 designers from the UK, USA and Dubai; and 3500 workmen on site at any given time. It took two years to reclaim the island in the shore waters of the Arabian Gulf, and a further three years to erect the magnificent landmark.\nAn incredible 70,000 cubic meters of concrete and more than 9,000 tonnes of steel were employed in the construction of the tower.\nThe finest and most exclusive materials were sourced for finishing the interiors of Burj Al Arab. Amongst the fine items brought in to create the magical interiors were custom-made carpets and rugs from South Africa and India; marble from Brazil and Italy; wooden doors from Dubai and chandeliers from the UK.\nApproximately 1,790m2 of 24-carat gold leaf was used to embellish the interior.\n\n","post_title":"Burj Al Arab","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"burj-al-arab","to_ping":"","pinged":"","post_modified":"2024-08-27 15:49:04","post_modified_gmt":"2024-08-27 13:49:04","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/burj-al-arab\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1723,"post_author":"9","post_date":"2022-05-05 13:26:00","post_date_gmt":"2022-05-05 13:26:00","post_content":"\nThe Cape Town Stadium is a stadium that was built for the 2010 FIFA World Cup. During the planning stage, it was known as the Green Point Stadium, which was the name of the previous stadium on the site, and this name was also used frequently during World Cup media coverage. The stadium has been crafted to take full advantage of the beauty of the area. At night, lit up against the black sky, the stadium appears to be a floating rose-shaped bowl. During the day, its Teflon-coated fibreglass facade reflects the ambience of the city, dependent on its weather patterns \u2013 bright, sunny skies or dramatic grey clouds.\n\n\n\nOf particular interest is the design of the stadium\u2019s roof. Don\u2019t be fooled by its bicycle wheel-like appearance. This glass-panelled roof has in fact been built according to a groundbreaking design, which protects spectators from rain and strong winds, lets light in, and reduces noise from within. Water that drains from the pitch, as well as water from the stadium\u2019s roof, is collected and pumped into ponds at the Green Point Common, helping the stadium to achieve its high levels of environmental protection.\n\n\n\n\n\nClient: Murray & Roberts and WBHO\n\n\n\nOwner: Cape Town Municipality\n\n\n\nLocation: Cape Town, South Africa\n\n\n\nScope of work: Building\n\n\n\nSector: Leisure, Recreation, Education\n\n\n\nContract Period: Broke ground 26 March 2007 \u2013 Opened 14 December 2009 (33 months)\n\n\n\nContract Value: US$ 95 000 000\n\n\n\nFloors: 7\n\n\n\nSteel: 15 593 tons\n\n\n\nConcrete: 140 000m3\n\n\n\nField Size: 290 X 265 X 48 M\n\n\n\nProduct used: RIB Candy\n\n\n\n\n\n\n\n\n\n\n\nInteresting Facts:\n\n\n\n\nFirst match played: 23 January 2010\nThe stadium had a seating capacity of 64,100 during the 2010 World Cup; later reduced to 55,000.\nIt is the home ground of Premier Soccer League clubs Ajax Cape Town (since 2010) and Cape Town City (since 2016). It has also hosted the South Africa Sevens rugby tournament since 2015.\nIts innovative design enables the stadium to be illuminated by natural light, minimising the number of lights needed, and hence increasing its energy efficiency.\nWhen deconstructed, 95% of the old Green Point Stadium\u2019s components were able to be recycled and reused.\nA cleverly-designed moat around the circumference of the field prevents field invasions.\nThe stadium\u2019s acoustic-dampening design makes it the ideal venue for music concerts.\nA police station has been constructed inside the stadium to deal with any unruly incidents or people at the stadium.\n\n","post_title":"Cape Town Stadium","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"cape-town-stadium","to_ping":"","pinged":"","post_modified":"2024-08-27 15:53:47","post_modified_gmt":"2024-08-27 13:53:47","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/cape-town-stadium\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1732,"post_author":"9","post_date":"2022-05-05 13:26:00","post_date_gmt":"2022-05-05 13:26:00","post_content":"\n\u201cThis museum will provide a home for a global community working to imagine, design and execute a better future.\u2019\u2019 This Project is earmarked an Iconic project for the UAE and a mainstay for Dubai tourism. ATS\u2019s role involved a Pre-Construction Services Agreement (PCSA) to study the design, review buildability issues and assist in the early procurement. \n\n\n\nUpon the completion of the PCSA, the fit out project consisted of works to G+7 floors of Exhibition and Auxiliary spaces. 5 levels, designed for innovative and immersive exhibits including a Media lift. 1 No floor is for executive offices within the main building and 2 No floors of additional office space in the  adjacent JET Towers working as the executive satellite offices. Ground floor and Podium areas have auxiliary spaces such as F&B, retail and temporary exhibitions.  \n\n\n\nThe Exhibition spaces include state of the art AV\/IT immersive experiences along with pioneering fit out works.\n\n\n\n\n\nClient: Al Tayer Stocks\n\n\n\nOwner: Dubai Future Foundation\n\n\n\nLocation: Dubai, UAE\n\n\n\nScope of work: Traditional\n\n\n\nSector: Technology\n\n\n\nContract Period: 1 year\n\n\n\nProduct used: Candy\n\n\n\n\n\n\n\n\n\n\n\nInteresting facts about the project:\n\n\n\n\nManpower at peak (on- site = 450 Pax)\nTotal 400,000 man-hours worked on site (LTI free)\nOffsite fabrication Circa Over 1 million man-hours worked\n290 Tons of steel utilized\nInternational fabricators\/ suppliers spread across 40 countries from 5 continents.\n14 nationalities involved with MOTF project. \n\n","post_title":"Museum of the Future","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"museum-of-future","to_ping":"","pinged":"","post_modified":"2024-08-28 09:09:02","post_modified_gmt":"2024-08-28 07:09:02","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/museum-of-future\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1722,"post_author":"9","post_date":"2022-06-02 13:26:00","post_date_gmt":"2022-06-02 13:26:00","post_content":"\n\/*! elementor - v3.14.0 - 08-06-2023 *\/\n.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}\n\n\n\nThe new Mall of Africa is the flagship retail development for Atterbury. The scale of the retail project is unprecedented in Africa, and is the largest retail development in Africa done in a single phase. There is 130000m2 of retail space and is the home to over 300 shops and boasts over 6,500 parking bays.\n\n\n\n\n\nClient: WBHO\n\n\n\nOwner: Atterbury Property Group\n\n\n\nLocation: Allendale, Gauteng, South Africa\n\n\n\nScope of work: Building\n\n\n\nSector: Retail\n\n\n\nContract Period: 28 Months\n\n\n\nContract Value: US$ 155 500 000\n\n\n\nBuilt up area: 550 000m2\n\n\n\nProduct used: Candy construction software\n\n\n\n\n\n\n\n\n\n\n\nInteresting Facts:\n\n\n\n\nThe mall was opened to the public on 28 April 2016 and resulted in heavy traffic congestion along the N1, N3 highways as well as most roads leading towards the area. Some stores had opening day sales that drew hundreds of shoppers into queues extending around the corners of the shops entrance. There were over 100 000 shoppers.\n\n\n\nThe inside decor takes its inspiration from the forests of central Africa, the great lakes in the east of the continent, the oil and trade of the west, the sand of the North African desert and the mineral wealth of southern Africa.\n\n","post_title":"Mall Of Africa","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"mall-of-africa","to_ping":"","pinged":"","post_modified":"2024-08-27 16:19:50","post_modified_gmt":"2024-08-27 14:19:50","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/mall-of-africa\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"}]; var sliderId = $(this).closest('.slider-post_slider').attr('id'); loadTabContent(tabId, selectedChoicesString, selectedPostIds, sliderId); }); if ($(window).width() < 768){ $('.slider-post_slider .accordion-item .accordion-button').unbind('click').click(function() { var tabId = $(this).parent().closest('div').attr('aria-labelledby'); console.log(tabId); var selectedChoicesString = tabId.replace('-tab',''); var selectedPostIds = [{"ID":1738,"post_author":"9","post_date":"2022-11-15 13:26:00","post_date_gmt":"2022-11-15 13:26:00","post_content":"\n\/*! elementor - v3.14.0 - 08-06-2023 *\/\n.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}\n\n\n\nIndustry:\n\n\n\nCivil construction.\n\n\n\nClient:\n\n\n\nWestforce Construction is a based in Western Australia and was founded in 2006,as an earthworks and concrete specialist. Since then, the company has grown exponentially to become a major contractor that specialises in all aspects of civil and structural construction works. Their key areas of focus are the resource and infrastructure sectors, and the company has completed numerous projects for the government departments of Defence, Water Corporation, Western Power, Main Roads, and Public Transport Association (PTA).\n\n\n\nIn December 2017, Westforce became part of the Raubex Group, one of South Africa\u2019s leading infrastructure and construction material supply groups. Their expertise extends across a variety of sectors including materials, roads, earthworks and infrastructure.\n\n\n\nTo date, the biggest and most successful project completed by Westforce has been a joint venture with JWI Construction, which saw both companies upgrade the drain diversion system for the Vasse River.\n\n\n\n\n\nThe Challenge:\n\n\n\nAs labour in Australia is expensive, Stanley Bubb, the financial manager at Westforce has access to a smaller workforce with which to run an effective financial department. In practise, this means that he and his assistant are responsible for managing the entire department from start to finish. This includes reconciling and paying invoices, completing all cost reporting and consolidating final reports for the Raubex head office.\n\n\n\n\n\n\nThe most important feature for me is the seamless integration between procurement and accounting provided by RIB with BuildSmart.\nStanley Bubb, Finance ManagerWestforce Construction\n\n\n\n\n\nBefore the implementation of the RIB solution, Westforce experienced a variety of challenges including:\n\n\n\n\nManual and time-consuming procurement of orders and processing of invoices\nIneffective reconciliation\nFaulty tracking of commitments and costs\nInaccurate cost reporting to head office\nDefective payroll calculations\n\n\n\n\nThe Solution:\n\n\n\nIn June 2019, RIB successfully implemented BuildSmart for Westforce. Having worked with this cost management and construction accounting solution previously, Stanley Bubb was already well acquainted with the software which led to a seamless integration with the company\u2019s day-to-day processes and workflow.\n\n\n\nBy integrating construction and project management as well as cost and accounting administration, BuildSmart empowers Westforce to operate as a successful construction company with integrated systems that ensure the correct execution and completion of projects.\n\n\n\nToday, Westforce benefits greatly from their use of BuildSmart, with the software providing an approval matrix designed to ensure that the procurement of electronic purchase orders is always pre-approved, and the reconciliation of orders is cost efficient.\n\n\n\nCost reporting to the Raubex head office has also become effortless thanks to BuildSmart\u2019s ability to export transaction listings.\n\n\n\nThe Results:\n\n\n\nSince implementing BuildSmart, Westforce has successfully completed a number of various projects such as:\n\n\n\n\nExcavation and earthworks for the Roy Hill Iron Ore mine in Newman\nThe construction of a new access walkway for train maintenance by the Public Transport Authority in Ridgewood\nAnd the Vasse River diversion drain upgrade in Busselton mentioned previously.\n\n\n\n\nGoing forward, Westforce plans to implement Candy and integrate it with BuildSmart to harness the full potential of the RIB Complete Solution; providing the company with enhanced functionality and visibility of their processes and budgets in real-time.\n","post_title":"Westforce Construction","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"westforce-construction","to_ping":"","pinged":"","post_modified":"2024-08-28 08:43:09","post_modified_gmt":"2024-08-28 06:43:09","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/westforce-construction\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1745,"post_author":"9","post_date":"2022-10-20 13:26:00","post_date_gmt":"2022-10-20 13:26:00","post_content":"\nIndustries:\n\n\n\nCivil Engineering\n\n\n\nGroundwork\n\n\n\nBackground:\n\n\n\nEstablished in 1994, PP Construction is a British-based contractor that operates across a variety of sectors including commercial, defence, education, infrastructure and retail.\n\n\n\nWith a hands-on approach to project management, the company believes in partnering closely with clients from the planning stage through to final delivery; this ensures every job is completed safely, on time and budget.\n\n\n\nAs a result of this ethos, PP Construction not only enjoys sustained success but repeat business from clients such as Balfour Beatty, Croudace Homes and Wates Construction. Today, the company has an annual turnover of \u00a310 million and works on projects ranging in value from \u00a350,000 to \u00a310 million.\n\n\n\n\n\nThe Challenge:\n\n\n\nTo ensure the successful day-to-day operation of the organisation, PP Construction has to be able to allocate costs correctly to their project and then track the progress of each throughout the lifecycle of a project.\n\n\n\nUnfortunately, before 2021, the company utilised a spreadsheet-based system that resulted in siloed information, manual errors and no means to identify\u2014in real time\u2014if a job was losing or making money. On top of this, the business also employed a generic enterprise resource planning solution that was not tailored to the construction industry.\n\n\n\n\n\n\nSupport has been absolutely incredible \u2013 even after-hours. Anytime and every time we have asked or needed support; RIB have been there for us. A quote from the last directors board meeting- \u2018These are the most solid figures and best reports we\u2019ve had in 26 years! We didn\u2019t use to know something was wrong until we ran out of money but now, we know before it gets to that and where we are losing it, allowing us to intervene and take corrective action before it\u2019s too late\u2019.\nZoe Perriam, Financial ControllerPP Construction Ltd\n\n\n\nThe Solution:\n\n\n\nAs a fully integrated cost management and enterprise accounting system, RIB BuildSmart was put forward to address the challenges encountered by PP Construction. Together with features designed specifically for the construction industry, this software seamlessly consolidates data for real-time insights no matter the stage of a project.\n\n\n\nThe Result:\n\n\n\nWith the implementation of BuildSmart, PP Construction is now empowered by a fit-for-purpose solution that harnesses data in real time to unite all stakeholders while covering every phase in the life cycle of a project.\n\n\n\nAs a result, the company not only enjoys the benefits of a construction-specific solution that aligns with their daily workflow, both in the office and on site, but they are also able to access valuable information from which informed decisions can be made on an operational, commercial and financial basis.\n\n\n\nThis, in turn, has led to significant cost savings thanks to the solution\u2019s in-depth and detailed reporting, increased collaboration between colleagues who all work from a single source of truth now, and phenomenal peace of mind stemming from superior 24\/7 support.\n\n\n\nGoing forward, PP Construction plan to implement RIB Candy and combine its estimating and project control functionality with BuildSmart, thereby unlocking for even greater cost control.\n","post_title":"PP Construction Ltd","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"pp-construction-ltd","to_ping":"","pinged":"","post_modified":"2024-08-28 08:47:53","post_modified_gmt":"2024-08-28 06:47:53","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/pp-construction-ltd\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1740,"post_author":"9","post_date":"2022-11-15 13:26:00","post_date_gmt":"2022-11-15 13:26:00","post_content":"\n\/*! elementor - v3.14.0 - 08-06-2023 *\/\n.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}\n\n\n\nIndustry:\n\n\n\n\nEarthworks\nCivil Construction\nCommercial and Industrial\nRail Works\nPublic Works\n\n\n\n\nClient:\n\n\n\nDavison Earthmovers is based in Adelaide, South Australia, and has been in operation since 1986. The company was originally founded by John Davison but in July 2021 was taken over by his son, Paul. The company is focused on providing earthmoving services to the commercial, industrial, government and civil sectors. They undertake a wide variety of projects, ranging from large-scale bulk earthworks using heavy machinery to smaller detailed works such as drainage, kerbing, landscaping, bitumen surfacing and more.\n\n\n\nOne of their biggest projects completed to date is the Mount Barker Regional Sports Hub which includes two full-sized soccer pitches, 28 000 m2 of roadway and footpath pavement, building pad construction works, two kilometres of stormwater infrastructure, and 700 m of grated-drain installation. The contract value for this project was $3.7 million and the construction duration was ten months.\n\n\n\n\n\nThe Challenge:\n\n\n\nBefore BuildSmart was implemented, Administration Manager Mary-Ann Higgins and her team experienced numerous challenges including:\n\n\n\n\nThe execution of supplier invoice approvals and storage processes separately from their accounting system\nThe manual consolidation of contracts, plant ledger and payroll to the general ledger\nCumbersome, manual data capturing utilising a paper-based system\nA reporting process hampered by a lack of effective system report options and ineffective collation of data\nNo activity-based costing which made it difficult to establish whether a project was making a profit or a loss\n\n\n\n\n\n\n\nI\u2019d recommend BuildSmart as a fully integrated system that includes payroll, plant and procurement modules. It gives us greater visibility and control, as all our information and documents are in one place. The combination of value for money, for all these modules in one system, together with dedicated support is great.\nMary-Ann Higgins, Administration Manager, Davison Earthmovers\n\n\n\nThe Solution:\n\n\n\nThe implementation of BuildSmart began in February 2021 and the solution went live in May of the same year. The entire process ran smoothly and was well received by Davison Earthmovers thanks to 24\/7 support from the RIB BuildSmart team.\n\n\n\nSince implementing the software:\n\n\n\n\nFull procurement workflow now happens automatically\nUnapproved committed costs and progress claims can be tracked and resolved accordingly\nImporting plant hours is seamlesstakes around an hour to complete as opposed to eight hours previously\nPayroll integration has improved with pay period rollover automatically posting to the contracts and general ledger\nLedger transactions can be run according to categories such as contact, supplier or by contract activity code. Reporting options and parameters have also improved vastly.\n\n\n\n\nThe Results:\n\n\n\nDavison Earthmovers\u2019 workflow and overview of their projects have been enhanced significantly with the help of BuildSmart. Thanks to the boost in productivity resulting from the solution, the company also enjoys improved cost and contract management, allowing time for the improvement of other systems and procedures.\n","post_title":"Davison Earthmovers","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"davison-earthmovers","to_ping":"","pinged":"","post_modified":"2024-08-28 09:34:18","post_modified_gmt":"2024-08-28 07:34:18","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/davison-earthmovers\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1741,"post_author":"9","post_date":"2022-04-29 13:26:00","post_date_gmt":"2022-04-29 13:26:00","post_content":"\nIndustry:\n\n\n\nSummertown Interiors is focused on Commercial, Healthcare and Retail related Fit-out projects.\n\n\n\nClient:\n\n\n\nSummertown Interiors\n\n\n\nFor over 20 Years, Summertown Interiors has been among the UAE\u2019s leading and most sustainable contractors, offering superior quality interior fit out solutions. Reputed for its green expertise and exceptional client service, the company specialises in commercial, healthcare, and education projects for global Fortune 500 companies, government authorities and local businesses.\n\n\n\nSummertown Interiors was the first fit-out contractor to occupy LEED Gold certified interiors in the United Arab Emirates and has also been awarded the LEED gold certification for its existing building; operations and maintenance (LEED EBOM). All projects are executed in accordance with the internationally recognised ISO 9001:2015 quality management system.\n\n\n\nSummertown Interior\u2019s mission is to consistently deliver high end interior projects on time and within budget, whilst helping companies to achieve their environmental goals, directly resulting in operational savings and a better workspace for employees.\n\n\n\n\n\nThe Challenge:\n\n\n\nPrior to implementing RIB solutions Candy and BuildSmart, Summertown Interiors faced challenges regarding procurement, timeous cost report generation, departments working in silos, timeous closing of books of account, delayed annual audits and visibility of cost to complete on a contract. They were also seeking software that would boost their tendering system in a highly competitive business, like interior fitout.\n\n\n\n\n\n\nI would recommend RIB products to others because it is developed by Contractors for Contractors\nDeniz Demir, Finance ManagerSummertown Interiors\n\n\n\nThe Solution:\n\n\n\nSummertown Interiors chose BuildSmart to form the backbone of their financial management system and Candy as their primary estimation and project control solution.\n\n\n\nImplementation:\n\n\n\nSummertown Interiors implemented RIB to meet the challenges faced by all departments and to streamline workflows and processes from first estimate through to final account. This included:\n\n\n\n\nCandy Estimating and Project Control\nBuildSmart Accounts\nBuildSmart Site Costs\nBuildSmart Procurement\nBuildSmart Payroll and Wages\nBuildSmart Equipment and Asset Management\n\n\n\n\nThe Results:\n\n\n\nSummertown Interiors have not only been empowered with tools for real-time \u2018cost vs allowable\u2019 comparisons, profitability analysis, and faster and more efficient decision-making; they have also successfully executed several large-scale projects for clients such as Takeda and the Government of Dubai Media Office.\n\n\n\nIn addition, the integrated cost management solution, comprising of Candy and BuildSmart, has led to significant time-savings, with month-end closings and audits now completed much faster than before, as well as increased accuracy when estimating. Deniz explains, \u201cthe safeguards that BuildSmart Procurement has in place, to prevent allowable rates and quantities being exceeded during purchasing, have also reduced failure costs.\u201d\n","post_title":"Summertown Interiors","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"summertown-interiors","to_ping":"","pinged":"","post_modified":"2024-08-28 09:41:24","post_modified_gmt":"2024-08-28 07:41:24","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/summertown-interiors\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1729,"post_author":"9","post_date":"2022-04-29 13:26:00","post_date_gmt":"2022-04-29 13:26:00","post_content":"\n\/*! elementor - v3.14.0 - 08-06-2023 *\/\n.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}\n\n\n\nIndustry:\n\n\n\nConstruction.\n\n\n\nClient:\n\n\n\nBK Gulf LLC.\n\n\n\nEstablished in 1978, BK Gulf LLC, part of the DUTCO Group of companies, are an MEP building services company providing a complete contracting service including design, procurement, installation, project management, commissioning and facilities management services to meet specific client requirements.\n\n\n\nBK Gulf LLC has been involved with some of the largest and most prestigious projects in the Middle East and covers a wide range of market sectors from residential and commercial property and hotel resorts to infrastructure development and airport expansion projects.\n\n\n\n\n\nThe Challenge:\n\n\n\nAs a provider of end-to- end construction services, the teams at BK Gulf manage projects that require highly complex cost control and productivity management. Often the teams were only able to analyse the data in hindsight, by which time, corrections and alternations were too late to be fully effective. This needed to change. As a result, BK Gulf wanted to overhaul their fairly closed accounts system. The need for easily accessible, visible, real time data was identified as the core solution along with reporting and procurement functions.\n\n\n\n\n\n\nRIB delivered more than we expected in a very short time frame. As part of the implementation process, the team ensured thorough knowledge transfer. This has enabled BK Gulf to realise the full benefits of the products immediately. We certainly made the right decision for our business by choosing RIB as our business partner. \nLuke Ashe, Commercial ManagerBKGULF LLC\n\n\n\n\n\nThe Solution:\n\n\n\nSharing Knowledge for better Solutions\n\n\n\nBK Gulf wanted a solution, not just a product. They knew that one-stop integrated systems are what we\u2019re best at. It was important for them to work with people who didn\u2019t just understand software, but who understood the industry. BK Gulf valued our field-specific knowledge, especially because our consultants had already come across similar problems. A fresh yet experienced pair of eyes was what they needed \u2013 and that is exactly what they got.\n\n\n\nImplementation\n\n\n\nOur preferred solution was quick and effective. We recommended a three (3) month programme implementing both Candy and BuildSmart simultaneously, focusing on:\n\n\n\n\nCandy Estimating & Project Control\nBuildSmart Accounts and Site costing\nBuildSmart Procurement and Materials costing\nBuildSmart Stock and Inventory Management\nBuildSmart Plant Management, Maintenance and Costing, Yard Stock\nBuildSmart Sub-Contractor Management\n\n\n\n\nThe Results:\n\n\n\nTime is of the Essence\n\n\n\nOur software is driving business efficiency at BK Gulf. Candy Valuations breaks down the BOQ, giving a quick snapshot and speeding up procurement. Information entered as work is done automatically feeds into the system \u2013 ready for reporting at the click of a button. They used to spend around ten (10) days manually pulling together cost reports from accounts release. That\u2019s now down to two (2) days. This has huge practical advantages. Staff have more time to review the data instead of preparing it. Audit time is reduced. And the board gets reports sooner thanks to the faster release of accounts information. The whole process used to take six (6) weeks. Now it takes just two (2) to three (3).\n\n\n\nReal-time Cost Approvals with Accuracy\n\n\n\nBK Gulf are now in control of contract costs. An updated resource list of the contract and BuildSmart ICMS real-time reporting means they can sit and discuss issues for the next plan \u2013 not old issues that have already happened. Data is hugely more accurate too. Information comes from source giving better quality data they know they can trust. They no longer need to pull together separate pieces of information together, meaning they no longer risk making errors. BK Gulf now have a tool to analyse data and find out if\/where there are any discrepancies.\n\n\n\nIntelligent Integration with Integrity\n\n\n\nRIB solutions are different to other software because they link and integrate all data. Everyone at BK Gulf now works with standard reports. In the same language. In the same format. Plus tight system security keeps their data safe.Clean cost data has been the biggest improvement for BK Gulf and it\u2019s thanks to our seamless link between procurement and cost accounting. They have the cost and activity codes right at the start, meaning everything flows all the way through. Gone are the days of manual requisitions and changing cost codes as the project goes through various approvals.\n","post_title":"BK Gulf LLC","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"bk-gulf-llc","to_ping":"","pinged":"","post_modified":"2024-08-27 16:30:28","post_modified_gmt":"2024-08-27 14:30:28","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/bk-gulf-llc\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1720,"post_author":"9","post_date":"2022-05-05 13:26:00","post_date_gmt":"2022-05-05 13:26:00","post_content":"\nBurj Al Arab is a luxury hotel located in Dubai, UAE. At 321m, it is the third tallest hotel in the world. Burj Al Arab stands on an artificial island 280m from Jumeirah beach and is connected to the mainland by a private curving bridge. The shape of the structure is designed to mimic the sail of a ship. It has a helipad near the roof at a height of 210m above ground.\n\n\n\n\n\nClient: Murray & Roberts and Al Habtoor Engineering\n\n\n\nOwner: Jumeirah group\n\n\n\nLocation: Dubai, UAE\n\n\n\nScope of work: Main Contractors\n\n\n\nSector: Hospitality\n\n\n\nContract Period: 1994 \u2013 1999\n\n\n\nNumber of rooms: 202\n\n\n\nFloor count: 56 (3 below ground)\n\n\n\nHight:\n\n\n\n\nArchitectural: 321m\nTop floor: 197.5m\n\n\n\n\nContract Value: US$ 1 000 000 000\n\n\n\nProduct used: RIB Candy Software\n\n\n\n\n\n\n\n\n\n\n\nInteresting Facts:\n\n\n\n\nConstruction involved 3000 companies and contractors; 250 designers from the UK, USA and Dubai; and 3500 workmen on site at any given time. It took two years to reclaim the island in the shore waters of the Arabian Gulf, and a further three years to erect the magnificent landmark.\nAn incredible 70,000 cubic meters of concrete and more than 9,000 tonnes of steel were employed in the construction of the tower.\nThe finest and most exclusive materials were sourced for finishing the interiors of Burj Al Arab. Amongst the fine items brought in to create the magical interiors were custom-made carpets and rugs from South Africa and India; marble from Brazil and Italy; wooden doors from Dubai and chandeliers from the UK.\nApproximately 1,790m2 of 24-carat gold leaf was used to embellish the interior.\n\n","post_title":"Burj Al Arab","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"burj-al-arab","to_ping":"","pinged":"","post_modified":"2024-08-27 15:49:04","post_modified_gmt":"2024-08-27 13:49:04","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/burj-al-arab\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1723,"post_author":"9","post_date":"2022-05-05 13:26:00","post_date_gmt":"2022-05-05 13:26:00","post_content":"\nThe Cape Town Stadium is a stadium that was built for the 2010 FIFA World Cup. During the planning stage, it was known as the Green Point Stadium, which was the name of the previous stadium on the site, and this name was also used frequently during World Cup media coverage. The stadium has been crafted to take full advantage of the beauty of the area. At night, lit up against the black sky, the stadium appears to be a floating rose-shaped bowl. During the day, its Teflon-coated fibreglass facade reflects the ambience of the city, dependent on its weather patterns \u2013 bright, sunny skies or dramatic grey clouds.\n\n\n\nOf particular interest is the design of the stadium\u2019s roof. Don\u2019t be fooled by its bicycle wheel-like appearance. This glass-panelled roof has in fact been built according to a groundbreaking design, which protects spectators from rain and strong winds, lets light in, and reduces noise from within. Water that drains from the pitch, as well as water from the stadium\u2019s roof, is collected and pumped into ponds at the Green Point Common, helping the stadium to achieve its high levels of environmental protection.\n\n\n\n\n\nClient: Murray & Roberts and WBHO\n\n\n\nOwner: Cape Town Municipality\n\n\n\nLocation: Cape Town, South Africa\n\n\n\nScope of work: Building\n\n\n\nSector: Leisure, Recreation, Education\n\n\n\nContract Period: Broke ground 26 March 2007 \u2013 Opened 14 December 2009 (33 months)\n\n\n\nContract Value: US$ 95 000 000\n\n\n\nFloors: 7\n\n\n\nSteel: 15 593 tons\n\n\n\nConcrete: 140 000m3\n\n\n\nField Size: 290 X 265 X 48 M\n\n\n\nProduct used: RIB Candy\n\n\n\n\n\n\n\n\n\n\n\nInteresting Facts:\n\n\n\n\nFirst match played: 23 January 2010\nThe stadium had a seating capacity of 64,100 during the 2010 World Cup; later reduced to 55,000.\nIt is the home ground of Premier Soccer League clubs Ajax Cape Town (since 2010) and Cape Town City (since 2016). It has also hosted the South Africa Sevens rugby tournament since 2015.\nIts innovative design enables the stadium to be illuminated by natural light, minimising the number of lights needed, and hence increasing its energy efficiency.\nWhen deconstructed, 95% of the old Green Point Stadium\u2019s components were able to be recycled and reused.\nA cleverly-designed moat around the circumference of the field prevents field invasions.\nThe stadium\u2019s acoustic-dampening design makes it the ideal venue for music concerts.\nA police station has been constructed inside the stadium to deal with any unruly incidents or people at the stadium.\n\n","post_title":"Cape Town Stadium","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"cape-town-stadium","to_ping":"","pinged":"","post_modified":"2024-08-27 15:53:47","post_modified_gmt":"2024-08-27 13:53:47","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/cape-town-stadium\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1732,"post_author":"9","post_date":"2022-05-05 13:26:00","post_date_gmt":"2022-05-05 13:26:00","post_content":"\n\u201cThis museum will provide a home for a global community working to imagine, design and execute a better future.\u2019\u2019 This Project is earmarked an Iconic project for the UAE and a mainstay for Dubai tourism. ATS\u2019s role involved a Pre-Construction Services Agreement (PCSA) to study the design, review buildability issues and assist in the early procurement. \n\n\n\nUpon the completion of the PCSA, the fit out project consisted of works to G+7 floors of Exhibition and Auxiliary spaces. 5 levels, designed for innovative and immersive exhibits including a Media lift. 1 No floor is for executive offices within the main building and 2 No floors of additional office space in the  adjacent JET Towers working as the executive satellite offices. Ground floor and Podium areas have auxiliary spaces such as F&B, retail and temporary exhibitions.  \n\n\n\nThe Exhibition spaces include state of the art AV\/IT immersive experiences along with pioneering fit out works.\n\n\n\n\n\nClient: Al Tayer Stocks\n\n\n\nOwner: Dubai Future Foundation\n\n\n\nLocation: Dubai, UAE\n\n\n\nScope of work: Traditional\n\n\n\nSector: Technology\n\n\n\nContract Period: 1 year\n\n\n\nProduct used: Candy\n\n\n\n\n\n\n\n\n\n\n\nInteresting facts about the project:\n\n\n\n\nManpower at peak (on- site = 450 Pax)\nTotal 400,000 man-hours worked on site (LTI free)\nOffsite fabrication Circa Over 1 million man-hours worked\n290 Tons of steel utilized\nInternational fabricators\/ suppliers spread across 40 countries from 5 continents.\n14 nationalities involved with MOTF project. \n\n","post_title":"Museum of the Future","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"museum-of-future","to_ping":"","pinged":"","post_modified":"2024-08-28 09:09:02","post_modified_gmt":"2024-08-28 07:09:02","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/museum-of-future\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"},{"ID":1722,"post_author":"9","post_date":"2022-06-02 13:26:00","post_date_gmt":"2022-06-02 13:26:00","post_content":"\n\/*! elementor - v3.14.0 - 08-06-2023 *\/\n.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}\n\n\n\nThe new Mall of Africa is the flagship retail development for Atterbury. The scale of the retail project is unprecedented in Africa, and is the largest retail development in Africa done in a single phase. There is 130000m2 of retail space and is the home to over 300 shops and boasts over 6,500 parking bays.\n\n\n\n\n\nClient: WBHO\n\n\n\nOwner: Atterbury Property Group\n\n\n\nLocation: Allendale, Gauteng, South Africa\n\n\n\nScope of work: Building\n\n\n\nSector: Retail\n\n\n\nContract Period: 28 Months\n\n\n\nContract Value: US$ 155 500 000\n\n\n\nBuilt up area: 550 000m2\n\n\n\nProduct used: Candy construction software\n\n\n\n\n\n\n\n\n\n\n\nInteresting Facts:\n\n\n\n\nThe mall was opened to the public on 28 April 2016 and resulted in heavy traffic congestion along the N1, N3 highways as well as most roads leading towards the area. Some stores had opening day sales that drew hundreds of shoppers into queues extending around the corners of the shops entrance. There were over 100 000 shoppers.\n\n\n\nThe inside decor takes its inspiration from the forests of central Africa, the great lakes in the east of the continent, the oil and trade of the west, the sand of the North African desert and the mineral wealth of southern Africa.\n\n","post_title":"Mall Of Africa","post_excerpt":"","post_status":"publish","comment_status":"closed","ping_status":"closed","post_password":"","post_name":"mall-of-africa","to_ping":"","pinged":"","post_modified":"2024-08-27 16:19:50","post_modified_gmt":"2024-08-27 14:19:50","post_content_filtered":"","post_parent":0,"guid":"https:\/\/www.rib-software.com\/case-study\/mall-of-africa\/","menu_order":0,"post_type":"case-studies","post_mime_type":"","comment_count":"0","filter":"raw"}]; var sliderId = $(this).closest('.slider-post_slider').attr('id'); loadTabContent(tabId, selectedChoicesString, selectedPostIds, sliderId); }); } // Function to escape special characters in selector function escapeSelector(selector) { return selector.replace(/[!"#$%&'()*+,.\/:;?@[\\\]^`{|}~]/g, "\\$&"); } } }); What’s Happening at RIB Software
  • [H2] EBooks
  • [H2] Blogs
  • [H2] News
  • [H2] Events
  • [H5] Bevorzugen Sie die deutsche Webseite?
  • [H5] Vil du til det danske website?

Images

We found 122 images on this web page.

83 alt attributes are empty or missing. Add alternative text so that search engines can better understand the content of your images.

Text/HTML Ratio

Ratio : 5%

This page's ratio of text to HTML code is below 15 percent, this means that your website probably needs more text content.

Flash

Perfect, no Flash content has been detected on this page.

Iframe

Too Bad, you have Iframes on the web pages, this mean that content in an Iframe cannot be indexed.

URL Rewrite

Good. Your links looks friendly!

Underscores in the URLs

Perfect! No underscores detected in your URLs.

In-page links

We found a total of 90 links including 0 link(s) to files

Anchor Type Juice
2D/3D Take-off & Estimating Internal Passing Juice
Bid Management Internal Passing Juice
Business Intelligence Internal Passing Juice
Collaboration & Document Management Internal Passing Juice
Commissioning & Handover Internal Passing Juice
Field & Operations Management Internal Passing Juice
Operation & Maintenance Internal Passing Juice
Planning & Design Internal Passing Juice
Prefabrication Internal Passing Juice
Procurement Internal Passing Juice
Project & Financial Control Internal Passing Juice
Scheduling & Resource Management Internal Passing Juice
Sustainability Internal Passing Juice
Architect Internal Passing Juice
BIM Manager Internal Passing Juice
Building Product Manufacturers Internal Passing Juice
C-Level Executive Internal Passing Juice
Contracts Manager Internal Passing Juice
Engineer Internal Passing Juice
Estimator Internal Passing Juice
Finance Manager Internal Passing Juice
Planner/Scheduler Internal Passing Juice
Plant & Equipment Manager Internal Passing Juice
Prefab Production Manager Internal Passing Juice
Procurement Manager Internal Passing Juice
Project Manager Internal Passing Juice
Quantity Surveyor Internal Passing Juice
Specifier Internal Passing Juice
Sustainability/ESG Manager Internal Passing Juice
Blogs Internal Passing Juice
Case Studies Internal Passing Juice
eBooks Internal Passing Juice
Future Events Internal Passing Juice
Past Events Internal Passing Juice
Video Podcast Series Internal Passing Juice
Annual Virtual Event Internal Passing Juice
Student Resources Internal Passing Juice
Support Internal Passing Juice
Training Internal Passing Juice
Client Resources Internal Passing Juice
About RIB Internal Passing Juice
News Internal Passing Juice
Careers Internal Passing Juice
Contact Us Internal Passing Juice
GET MY CUSTOM PRICE Internal Passing Juice
LOGIN Internal Passing Juice
Deutsch Internal Passing Juice
Dansk Internal Passing Juice
Get My Free Demo Internal Passing Juice
Get My Free Ticket Now External Passing Juice
GET THE COMPLETE REPORT Internal Passing Juice
Westforce Construction Internal Passing Juice
PP Construction Ltd Internal Passing Juice
Davison Earthmovers Internal Passing Juice
Summertown Interiors Internal Passing Juice
BK Gulf LLC Internal Passing Juice
Burj Al Arab Internal Passing Juice
Cape Town Stadium Internal Passing Juice
Museum of the Future Internal Passing Juice
Mall Of Africa Internal Passing Juice
eBook – From Challenges to Opportunities. The A to Z of BIM. Internal Passing Juice
Mastering Change Before It Masters Your Project Internal Passing Juice
Take Control of Construction Costs — and Your Project’s Future Internal Passing Juice
Want to Transform Your Job Site with Connected Construction? Internal Passing Juice
Is Construction the Weak Link in the Expansion of the Data Center Industry? Internal Passing Juice
No Construction Project is Exempt from Quality Management Internal Passing Juice
Are Your Construction Estimates Holding You Back? Internal Passing Juice
Supercharge Your Excel Estimating with RIB CostX Internal Passing Juice
Build Sustainably. Build Smarter. Internal Passing Juice
Chat with us External noFollow
LiveChat External Passing Juice
RIB 4.0 Internal Passing Juice
RIB BI+ Internal Passing Juice
RIB BuildSmart Internal Passing Juice
RIB Candy Internal Passing Juice
RIB Civil Internal Passing Juice
RIB Connex Internal Passing Juice
RIB CostX Internal Passing Juice
RIB CX Internal Passing Juice
RIB Digital Handover Internal Passing Juice
RIB One Prefab Internal Passing Juice
RIB Presto Internal Passing Juice
RIB Project Internal Passing Juice
RIB SpecLink Internal Passing Juice
RIB SpecLive Internal Passing Juice
Legal Terms Internal Passing Juice
Privacy Policy Internal Passing Juice
Imprint Internal Passing Juice
Conditions of Use Internal Passing Juice
Privacy Settings Internal Passing Juice

SEO Keywords

Keywords Cloud

project industry construction estimating mins read rib management manager more

Keywords Consistency

Keyword Content Title Keywords Description Headings
rib 39
project 29
manager 25
construction 23
management 22

Usability

Url

Domain : rib-software.com

Length : 16

Favicon

Great, your website has a favicon.

Printability

We could not find a Print-Friendly CSS.

Language

Good. Your declared language is en.

Dublin Core

This page does not take advantage of Dublin Core.

Document

Doctype

HTML 5

Encoding

Perfect. Your declared charset is UTF-8.

W3C Validity

Errors : 0

Warnings : 0

Email Privacy

Great no email address has been found in plain text!

Deprecated HTML

Great! We haven't found deprecated HTML tags in your HTML.

Speed Tips

Excellent, your website doesn't use nested tables.
Too bad, your website is using inline styles.
Great, your website has few CSS files.
Too bad, your website has too many JS files (more than 6).
Too bad, your website does not take advantage of gzip.

Mobile

Mobile Optimization

Apple Icon
Meta Viewport Tag
Flash content

Optimization

XML Sitemap

Great, your website has an XML sitemap.

https://www.rib-software.com/sitemap.xml

Robots.txt

https://rib-software.com/robots.txt

Great, your website has a robots.txt file.

Analytics

Missing

We didn't detect an analytics tool installed on this website.

Web analytics let you measure visitor activity on your website. You should have at least one analytics tool installed, but It can also be good to install a second in order to cross-check the data.

PageSpeed Insights


Device
Categories

Free SEO Testing Tool

Free SEO Testing Tool is a free SEO tool which provides you content analysis of the website.